Chipping Away

Any spare time we’ve had, which is sparse due to MM’s current work roster, we’ve spent emptying Dad’s house and getting it ready to sell. Some of the furniture has ended up in the middle of my lounge room waiting for me to sell on Ebay, and the rest handed around to family members. The charity store ended up with 2 full skip bins of stuff and 1 trailer load went to the dump.

Our own renovations are inching along. Even if we only get to install 1 tap over the week, it’s still progression.

The bathroom is almost finished with the glass splash panel/shower screen the only item left.

Bathroom 4

We’ve installed LED down-lights, ceiling vent, flat-bottomed bath (easier to stand in) with shower overhead, vanity unit, mirror and towel racks. Tiled to ceiling.

We’ve installed a new toilet, painted and tiled the room.

 

We are waiting for the kitchen bench and splash-back to be installed so we can then finish off the kitchen and install the sink, dishwasher, cook-top and range-hood. Crossing fingers it will be done next week.

We then get the tiler back to finish off the floor tiling and we can move into the house. Yippy, it’s getting frigid out in the pergola where we eat at night.

 

About fluidicthought

Random thoughts put out there to stimulate the development and growth of new thoughts.
This entry was posted in Australia, Home Renovations, Photography and tagged , . Bookmark the permalink.

3 Responses to Chipping Away

  1. nice home improvement project, looking good, well done and congrats!

    Like

I appreciate your comments

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s